Timeline

The story of MPL so far, from founding to first hotfire push.

  1. May 2025

    MPL founded

    Ayan Chakraborty founds the McCallie Propulsion Lab with help from Andrew Voss, formerly of SpaceX.

  2. August 2025

    Core team joins

    Jack Sokhol, AJ Gupta, Josiah Obeng-Boampong, and Praketh Bathi come on board.

  3. October 28, 2025

    SPARK ignition system hot-fired

    First hot-fire of the ignition system for the Hyperion liquid rocket engine. SPARK V1 runs on methane and gaseous oxygen, with combustion gases reaching roughly half the temperature of the sun.

  4. December 19, 2025

    Critical design review with Relativity Space

    Engine-level CDR completed with Relativity Space, with changes planned before manufacturing. A 1:1 scale 3D print of the engine is made to check for design issues before metal printing.

  5. January 16, 2026

    Test stand manufacturing begins

    Manufacturing starts on the test stand for Hyperion, built with future engines in mind too.

  6. February 21, 2026

    Aluminum engine arrives

    The fully printed aluminum Hyperion engine arrives.

  7. March 14, 2026

    Visit to Relativity Space at Stennis

    The team tours Relativity Space at NASA's Stennis Space Center, sees multiple test stands, learns about Terran R testing, and gets feedback on the Hyperion design.

  8. April 10, 2026

    1st place at Chattanooga Regional Science and Engineering Fair

    The team wins 1st place in Engineering Technology: Statics and Dynamics at the 74th annual fair.

  9. May 5, 2026

    Visit to Hermeus

    The team visits Hermeus and gets operational insight and design feedback.

  10. May 18, 2026

    Test stand mainframe completed

    Welding and painting of the test stand mainframe finish. Plumbing remains.

  11. June 4, 2026

    Team changes

    Porter O'Shaughnessy, Kol Lea, and Tarek Ankar-Burdette join the team; Jack Sokhol leaves.

  12. June 11, 2026

    Remaining engine parts and SPARK V2 arrive

    The last pieces of the Hyperion engine arrive, along with SPARK V2.

  13. Ongoing

    Hyperion hotfire push, plus new fronts

    Working toward a Hyperion hotfire, hopefully around late 2026, while also moving on test stand plumbing, Helios engine design, and lander design.