Test Stand Build
The test stand's steel base frame, welded and squared up on the shop floor.
A second frame going up alongside it as the build scaled.
Freshly painted and drying, wet paint sign still taped on.
Wiring the electronics enclosure onto the frame.
The plumbing manifold taking shape, with our P&ID diagram taped up for reference.
The completed test stand, painted and fitted with propellant plumbing, valves, and instrumentation.
Fully wired and loaded with the propellant tank, ready for static-fire testing.
Grinding steel for the frame.
Engine Hardware
Hyperion, our machined injector and nozzle assembly.
Precision-machined injector face plates and pintle before final assembly.
CAD design of our custom thrust vector control (TVC) actuator.
A precision-machined valve component from our SPARK engine series.
CAD Designs
Full CAD model of Hyperion, our injector and nozzle assembly.
Cross-section of Hyperion, showing the internal propellant flow paths.
Cutaway view of the custom TVC actuator, showing the internal lead screw and gearing.
CAD model of the SPARK V1 valve.
CAD model of the SPARK V2 valve, our next design iteration.
In the Shop
Machining engine hardware in the shop.